HI All,
I'm looking for a way to use the MRP to create a load of washers from a
length of steel pipe which is ordered in from a supplier. A piece of pipe
is cut into 1000 pieces so one productId is chopped up and 1000 items of a
different productId needs to be put into stock and a number of these
washers used further down the production chain.
Assembling the length of pipe from 1000 washers is straight forward enough
- but I need to effectively disassemble the pipe and I cannot see if this
functionality has been implemented. Can anyone point me in the right
direction?
Many Thanks,
Provolve Ltd
Front Office, Deale House, 16 Lavant Street, Petersfield, GU32 3EW, UK
t: 01730 267868 / m: 079 0968 5308
e: ruperthowell [ at ] provolve.com
w: http://www.provolve.com
I'm looking for a way to use the MRP to create a load of washers from a
length of steel pipe which is ordered in from a supplier. A piece of pipe
is cut into 1000 pieces so one productId is chopped up and 1000 items of a
different productId needs to be put into stock and a number of these
washers used further down the production chain.
Assembling the length of pipe from 1000 washers is straight forward enough
- but I need to effectively disassemble the pipe and I cannot see if this
functionality has been implemented. Can anyone point me in the right
direction?
Many Thanks,